A-00Company profile
Contractingand engineeringmanagement.
The scope covers structural works, finishing and furnishing, alongside quality monitoring and documented handover. Stages run in a defined order, and each is signed off before the next begins.
Delivery stages
The works divide into four stages of seven services each. Every stage has a defined scope and an acceptance record.
-
1
Structural
The works that precede any covering: foundations, structural frame, insulation and first-fix services.
- 01Structural skeleton
- 02Foundations
- 03Tools & equipment
- 04Structure
- 05Insulation
- 06Plumbing & wiring extension
- 07Preparation & handover
-
2
Finishing
The visible surfaces of the building: ceilings, floors, walls, openings, facades and the surrounding areas.
- 08Ceilings
- 09Doors & windows
- 10Flooring
- 11Wall finishes
- 12Sanitary & electrical fixtures
- 13Landscaping
- 14Facades
-
3
Furnishing
The fit-out that prepares the building for use: kitchens, joinery, appliances, furniture and soft furnishings.
- 15Kitchens
- 16Furniture & upholstery
- 17Wooden furniture
- 18Furnishings
- 19Electrical & sanitary appliances
- 20Accessories
- 21Inspection & handover
-
4
Monitoring & handover
Acceptance records for each stage, quality inspections, deliverables tracking, and the final handover file.
- 22Structural handover
- 23Finishing handover
- 24Outfitting handover
- 25Quality monitoring
- 26Deliverables tracking
- 27Reporting
- 28Certification
Areas of work
Three areas covering structural design, construction management and finishing management.
-
Structural engineering
Structural design and construction supervision for master plans.
Details
-
Construction management
The stages of construction project management, from setup to close-out.
Details
-
Finishing management
The stages of finishing and decoration management, through to acceptance.
Details
Working method
The procedures applied on every project, from scope approval through to the handover file.
-
A written scope of works
Items, quantities and specifications are set out in a single document, approved before work begins and referenced at every later stage.
-
Documented stage acceptance
Each stage closes with an acceptance record, a site survey and photographs before the following stage begins.
-
Variations approved before execution
The cost and programme impact of any variation is assessed, documented and approved in writing before work proceeds.
-
A final handover file
As-built drawings, test certificates, warranty documents, inventories, and operating and maintenance manuals.
Request a scope study
Send the project details and receive a proposed scope and the stage suited to starting from.

