S-01Service list
Twenty-eight services, in order of execution.
The services appear in the order they are carried out. Each stage contains seven. Select a stage to view its services, or move across the tiles of the mark.
Structural
The works that precede any covering: foundations, structural frame, insulation and first-fix services.
-
01
Structural skeleton
Columns, beams and slabs built to the approved structural drawings.
-
02
Foundations
Excavation, soil treatment, footings and rafts sized to the soil report.
-
03
Tools & equipment
Site plant, formwork, scaffolding and lifting within the contracted scope.
-
04
Structure
Block work, partitions and the walls forming the internal layout.
-
05
Insulation
Thermal, water and acoustic insulation applied before anything closes over it.
-
06
Plumbing & wiring extension
First-fix pipework and conduit routed and tested before the walls are closed.
-
07
Preparation & handover
The structural stage closed out with a survey, photographs and a signed record.
Finishing
The visible surfaces of the building: ceilings, floors, walls, openings, facades and the surrounding areas.
-
08
Ceilings
Gypsum, suspended and decorative ceilings, with the lighting layout approved beforehand.
-
09
Doors & windows
Openings supplied, fitted, sealed and adjusted for proper closure.
-
10
Flooring
Tile, stone, parquet and screed laid to level and to a set-out plan.
-
11
Wall finishes
Plaster, paint, cladding and wallpaper over a prepared, approved substrate.
-
12
Sanitary & electrical fixtures
Second fix: outlets, switches, taps and sanitary ware installed and tested.
-
13
Landscaping
Hardscape, planting, irrigation and exterior lighting.
-
14
Facades
Cladding, glazing and facade detailing, including maintenance access.
Furnishing
The fit-out that prepares the building for use: kitchens, joinery, appliances, furniture and soft furnishings.
-
15
Kitchens
Cabinetry, worktops, appliances and service connections as one package.
-
16
Furniture & upholstery
Loose furniture selected, sourced and placed to the approved layout.
-
17
Wooden furniture
Built-in joinery: wardrobes, panelling, doors and made-to-measure carpentry.
-
18
Furnishings
Curtains, rugs and textiles specified within the approved interior scheme.
-
19
Electrical & sanitary appliances
Appliances supplied, installed, commissioned and registered under warranty.
-
20
Accessories
Ironmongery, light fittings, mirrors and final finishing details.
-
21
Inspection & handover
A room-by-room inspection against the furnishing schedule before sign-off.
Monitoring & handover
Acceptance records for each stage, quality inspections, deliverables tracking, and the final handover file.
-
22
Structural handover
Signed off against drawings, test results and the site records.
-
23
Finishing handover
Accepted after a snag list is raised, closed and re-checked.
-
24
Outfitting handover
Furnishing and fit-out handed over with inventories and warranty documents.
-
25
Quality monitoring
Scheduled inspections and material conformity checks throughout the works.
-
26
Deliverables tracking
A maintained list of deliverables due, the responsible party and the date.
-
27
Reporting
Progress reports with photographs, quantities and the variance against plan.
-
28
Certification
Test certificates, as-built drawings and operating documents collected in one file.
Send the project details and receive a proposed scope and the stage suited to starting from.
Request a service
