P-03The programme

Ten phases from brief to handover.

The route a project follows. Durations vary with the size and scope of the project; the sequence and the acceptance points remain the same.

  • Structural
  • Finishing
  • Furnishing
  • Monitoring & handover
  1. 01

    Brief & feasibility

    Scope, budget range and buildability checked against the actual site.

    Structural
  2. 02

    Design & structural drawings

    Architectural and structural sets developed to a coordinated issue.

    Structural
  3. 03

    Permits & contracts

    Approvals, licences, and a scope-of-works contract with a payment schedule.

    Structural
  4. 04

    Site setup & foundations

    Site established, soil treated, foundations poured and tested.

    Structural
  5. 05

    Structural frame

    Frame and slabs go up floor by floor, against the concrete pour schedule.

    Structural
  6. 06

    Envelope & insulation

    The building is closed in: external walls, roof, insulation, openings.

    Finishing
  7. 07

    First fix services

    Mechanical, electrical and plumbing routed and pressure-tested.

    Finishing
  8. 08

    Finishes

    Ceilings, floors, walls and facades executed to the approved finishes schedule.

    Finishing
  9. 09

    Furnishing & fit-out

    Kitchens, joinery, appliances and furniture installed and commissioned.

    Furnishing
  10. 10

    Snagging & handover

    Snag list closed, certificates collected, keys and documents handed over.

    Monitoring & handover