P-03The programme
Ten phases from brief to handover.
The route a project follows. Durations vary with the size and scope of the project; the sequence and the acceptance points remain the same.
- Structural
- Finishing
- Furnishing
- Monitoring & handover
-
01
Structural
Brief & feasibility
Scope, budget range and buildability checked against the actual site.
-
02
Structural
Design & structural drawings
Architectural and structural sets developed to a coordinated issue.
-
03
Structural
Permits & contracts
Approvals, licences, and a scope-of-works contract with a payment schedule.
-
04
Structural
Site setup & foundations
Site established, soil treated, foundations poured and tested.
-
05
Structural
Structural frame
Frame and slabs go up floor by floor, against the concrete pour schedule.
-
06
Finishing
Envelope & insulation
The building is closed in: external walls, roof, insulation, openings.
-
07
Finishing
First fix services
Mechanical, electrical and plumbing routed and pressure-tested.
-
08
Finishing
Finishes
Ceilings, floors, walls and facades executed to the approved finishes schedule.
-
09
Furnishing
Furnishing & fit-out
Kitchens, joinery, appliances and furniture installed and commissioned.
-
10
Monitoring & handover
Snagging & handover
Snag list closed, certificates collected, keys and documents handed over.
Request a scope study
Send the project details and receive a proposed scope and the stage suited to starting from.